Manufacturing
A 12,000 m² facility built for one verified production path
Every door and wall panel moves through the same automated door-leaf, CNC, edge-banding, six-sided drilling and finishing lines, whatever the project scale.
12,000 m²
Factory floor area
Automated door-leaf line
Production line
CNC routing
Precision cutting
Six-sided drilling
Hardware prep


Production Path
Core to finished door, step by step
Automated Door-Leaf Line
Core assembly and lamination
CNC Routing
Panel profiles and edge geometry
Six-Sided Drilling
Hardware and hinge preparation
Finishing Line
Veneer, paint or laminate finish
Equipment
Lines used across every product category
Automated Door-Leaf Line
Assembles and laminates door cores with consistent thickness and density across production runs.
CNC Routing
Cuts panel profiles, mouldings and edge geometry to project drawings with repeatable precision.
Edge-Banding
Applies matched edge material to door and panel substrates for a continuous finished edge.
Six-Sided Drilling
Prepares hardware, hinge and lockset positions on all faces of the door leaf in one pass.
Finishing Line
Applies veneer, laminate or factory paint finishes under controlled conditions before packing.
Factory Gallery
Production, warehouse and facility views
Customer-supplied photographs from the Renfu manufacturing site.

























